NVIDIA · Ada Lovelace · 2023
L4 GPU accelerator
L4 GPU accelerator: 24 GB GDDR6, 72 W, 7,424 CUDA cores. Launched March 21, 2023.
- Memory
- 24 GB
- Power
- 72 W
- Bus width
- 192 bit
Memory24 GB
9 of 32 in Data Center
Power72 W
39 of 40 by higher draw in Data Center
CUDA cores7,424
11 of 47 in Data Center
Current market
Affiliate links — we may earn a commission.
Specifications
Memory
- Capacity
- 24 GB
- Memory type
- GDDR6
- Bus width
- 192 bit
- Bandwidth
- 300 GB/s
Compute
- CUDA cores
- 7,424
- SM count
- 60
- TMUs
- 240
- ROPs
- 80
- FP32
- 30,300 GFLOPS
- FP64
- 490 GFLOPS
Clocks
- Base clock
- 795 MHz
- Boost clock
- 2,040 MHz
Board
- TDP
- 72 W
- Form factor
- datacenter
Physical
- Architecture
- Ada Lovelace
- Series
- Data Center
- Launch date
- March 21, 2023
Not recorded by the source: generation, codename, process and transistors, or 7 further fields.
Die figure
Silicon, made visible
Die area is drawn against the largest recorded die in the catalog. Shader dots use a labeled, card-specific ratio so both early and modern GPUs remain legible.
Catalog context
Within its series, the L4 GPU accelerator ranks 11th of 36 for FP32 throughput and 9th of 32 for memory capacity. Its 72 W TDP is within the 75 W PCIe slot-power ceiling.
Source: Wikipedia, revision 1369488585 · catalog loaded 2026-08-16